Site Requirements

  • Reasonably level ground, most driveways are suitable.
  • 10 amp power supply.
  • Mains pressure or pump water supply.
  • Mains sewer point or septic located within 25m of where the bathroom is to be located (advise if it is further than 25m and we can supply more hose).
  • Power connection point located within 20m of where the bathroom is to be located.
  • Unobstructed access for installation and removal.
External trailer image

External dimensions including draw bar: 4m long x 2.5m wide x 2.8m high – this is the minimum site clearance required.


Internal dimensions of the bathroom: 2.5m long x 2m wide x 2.2m high.


It’s the hirer’s responsibility to check that the ensuite will fit on the proposed location. If, upon delivery, it’s deemed that the unit is unable to go in the required position and you wish to cancel then a delivery fee is retained from any refund offered.

Connection Requirements

Connection Requirements
Share by: